How long does it take to receive a FireFlex system?

FireFlex delivery time depends on the exact system type, size, release method, cabinet style, and selected options. The fastest way to avoid delays is to submit a complete and accurate configuration the first time.

There is no one fixed delivery time for every FireFlex unit. Delivery depends on the exact configuration you choose, including system type, system size, cabinet style, release method, and added options.

What this option means

In practice, “delivery time” is driven by how specific and complete your order is. FireFlex configuration documents require you to choose the system type first, then the style, release method, and finally the correct part number and options.

When to choose a simpler configuration
  • You want the shortest quoting and ordering cycle
  • You do not need special environmental construction
  • You do not need extra trim, seismic construction, remote-control, or special fittings
When to expect a longer process
  • Multiple unit sizes or different system types
  • Outdoor or freezing-environment construction
  • Seismic option
  • Remote-controlled configuration
  • Special flange or trim options
  • Refrigerated-area requirements
How to reduce delays
  • Submit one configuration form per system size or type when ordering multiple units
  • Confirm cabinet style, panel choice, release type, and options before sending the order
  • Match the project environment to the right product family early
Frequently Asked Questions

Is lead time the same for every FireFlex product?
No. It varies by system family and selected options.

Do multiple system sizes slow an order down?
They can. Configuration documents state that separate forms should be used when systems are not all the same.

What is the best way to speed up delivery?
Send a complete, accurate configuration with the correct system type, size, and options selected.