What Information Do You Need Before Requesting a FireFlex Quote?

To get an accurate FireFlex quotation, prepare the hazard description, desired system type, water supply information, design basis, electrical and detection requirements, project location, delivery expectations, and any owner or insurer requirements. The more complete the input, the faster the quote process usually becomes.

Incomplete requests often lead to revisions, delays, or pricing that has to be updated later. A good quote request helps everyone move faster.

Start with the application

Begin with a plain-language description of what the system needs to protect. For example:

  • Data room
  • Transformer
  • Freezer
  • Mechanical penthouse
  • Aircraft support building
  • Industrial process area

This gives the technical team context before they review detailed criteria.

Confirm the intended system type

If you already know the preferred solution, state it clearly. Examples may include:

  • Wet pipe
  • Dry pipe
  • Preaction
  • Deluge
  • Water mist
  • Foam-water
  • Clean agent
  • Corrosion mitigation package

If you are not sure, describe the hazard and operating conditions rather than guessing. A wrong assumption early in the process can affect the entire quote.

Provide design and code requirements

A quotation is much stronger when it includes the required design basis, such as:

  • Applicable NFPA standard
  • Required listing or approval
  • AHJ requirements
  • Insurer criteria
  • Owner specifications
  • Seismic requirements, if any

If the project must comply with a specific consultant standard or end-user specification, include that too.

Include water supply details

Water supply information is one of the most important inputs for water-based systems. Provide:

  • Available pressure
  • Available flow
  • Water supply test information
  • Static, residual, and flow values
  • Any known supply limitations

If a fire pump, foam proportioning equipment, or storage arrangement is involved, mention that in the request.

Describe the environment

Environmental conditions affect system selection and accessories. Include details such as:

  • Indoor or outdoor location
  • Heated or unheated space
  • Corrosive atmosphere
  • Remote location
  • Space limitations
  • Sensitive equipment nearby

For example, if the piping will be exposed to freezing temperatures, that should be identified immediately.

Note electrical and control expectations

If the system interfaces with detection, releasing, supervision, or building controls, say so early. Relevant details may include:

  • Voltage requirements
  • Releasing panel preferences
  • Detection scope
  • Supervisory points
  • Monitoring interface
  • Sequence of operation expectations

These items can change both scope and pricing.

Clarify project logistics

Commercial accuracy depends on logistics as well as engineering. Include:

  • Project name and location
  • Bid due date
  • Requested ship date
  • Destination address
  • Site access restrictions
  • Whether startup assistance is needed
  • Whether field service or training is required

A quote for a standard factory shipment is different from a quote that includes startup support, special crating, or expedited delivery.

Attach the right documents

Useful attachments often include:

  • Specification section
  • One-line or P&ID
  • Equipment schedule
  • Floor plan or mechanical room layout
  • Fire protection drawings
  • Sequence of operations
  • Tender documents

Even preliminary sketches can help if the design is still evolving.

Common mistakes to avoid

Avoid these common quote-request problems:

  • Sending only a model name with no application details
  • Omitting water supply information
  • Leaving out code or insurer requirements
  • Not identifying freeze exposure
  • Forgetting electrical interface requirements
  • Requesting pricing without a project timeline
A practical example

A contractor requesting a dry system for a parking structure should ideally include freeze exposure, water supply data, desired trim or monitoring features, shipment location, and project schedule. Without that information, the quote may need multiple revisions.

Next steps

Use a standardized internal checklist before sending your request. That reduces delays and improves the quality of pricing, submittals, and manufacturing planning.

Frequently Asked Questions

Can I request a quote before final design is complete?
Yes, but note which items are preliminary.

Do I need water supply information for all projects?
For water-based systems, it is strongly recommended.

What if I do not know the exact system type yet?
Describe the hazard, environment, and project goals instead.

Should I include owner specifications?
Yes. They can affect scope, approvals, and accessories.